| Location |
Pacwest
Center is located in the heart of Portland’s
Central Business District at 1211 SW Fifth Avenue.
Pacwest Center is ideally located within walking
distance of numerous shops, restaurants and entertainment
venues. |
| Building
Area |
522,161
SF Class A office space on 30 floors |
| Avg.
Floor NRA |
18,000
SF |
| Amenities |
Conference
facilities, gourmet coffee and food service, 24/7
uniformed security with a lobby presence, on-site
bicycle parking, tenant storage spaces, magnificent
panoramic views, full service banking, dry cleaning,
shoe repair, sundries, florist and gift shop, hair
salon, jewelry store, valet service,
car wash and tax preparation service |
| Accessibility |
Pacwest
Center is conveniently located in downtown Portland.
It is accessible by the Green Line at the City Hall
stop. (TriMet:
Public Transportation for Portland, OR) |
| Ownership |
Pacwest
Center, LLC |
| Management |
Ashforth
Pacific, Inc. provides an experienced on-site property
management team. |
| Major
Tenants |
Schwabe,
Williamson, & Wyatt, KeyBank, Oracle, Merrill
Lynch, Markowitz, Herbold, Glade & Mehlhaf, P.C. |
| Sustainability |
Energy
Star Rating: 82
LEED-EB OM: Registered |
| Year
Built |
Constructed
in 1984. Created by Hugh Asher Stubbins of Cambridge,
MA in collaboration with Skidmore, Owings & Merrill
Architects LLP of New York. |
| Parking |
418
subterranean spaces |
| Security
& Access |
24/7
uniformed security with a lobby presence and card
key access |
| Construction |
The
basic construction materials include steel and masonry
with a poured concrete slab foundation. Framing includes
structural steel with masonry and concrete encasement. |
|
| Ceiling
Heights |
|
| HVAC |
Fan
powered variable air volume boxes equipped with electric
reheat coils for the perimeter zones. Cooling is provided
by two 25-ton Trane A/C units on each floor. The Trane
units feed air to the VAV boxes. All thermostats and
dampers are pneumatic. A Barber Colman Network 8000
was installed in 1993 and acts as the backbone of the
system. The Barber system also controls the lighting
sweep. |
| Electricity |
The
8,000-amp main switchgear equipment supplies 480/277,
three phase electrical service to the bus riser system.
A stepdown transformer on each floor provides 208/120,
three phase electrical service. |
| Water |
Basement
level supply distributes cold water to all floors,
serving restrooms, drinking fountains and taps
for tenant needs using a packaged , staged triplex
booster system. Waste and vent system directed
to city waste water. Storm sewer drainage system
allows site water to be collected and drained through
surface drains located in the parking lot areas. |
| Energy
Mgmt. |
|
| Life
Safety |
Pacwest
is 100% sprinklered with a wet standpipe system (except
for the parking garage and the mechanical area on
the 30th floor, which are dry systems). The backbone
of the fire systems is a Siemens Firefinder XLS. |
| Elevators |
Otis
Elevator Company. 11– gearless passenger; 2 – hydraulic
parking; 1 – geared freight; 2 – escalators |
| Roof |
The
roof is concrete slab with a rubber membrane, high-density
foam covered by a vulcanized rubber membrane, felt and
river rock. |
| Structural
Frame |
The
building structural system is structural steel
frame with 3 inches deep composite deck. The decks
include 1.5 inches of concrete topping and steel
framing spans from 20 foot perimeter column spacing
to an average 40 foot interior bay depth. |
| Utility |
Electrical – Pacific
Power
Water and sewer– City of Portland
Trash Hauling – Trashco Trash
Gas-
NW Natural |
| Major
Operational Contractors |
- Cleaning – ABM
Janitorial Services
- Window
Cleaning – ABM Janitorial Services
- Security – Securitas
- Building
Controls – Control Contractors
- Life
Safety System – Siemens
|
|